Yem Technology Pty Ltd – Business Process Management
Essay Preview: Yem Technology Pty Ltd – Business Process Management
Report this essay
[pic 1][pic 2]Table of Contents1. Background Introduction        22. Current Business Process        23. Case Study        34. Might-be Plan B        44.1. Technical Support        44.2. Vendor Control        44.3. Quality Control        54.4. Delivery Control        54.5. Installation/ After-sale Labor Control.        55.Conclusion        51. Background Introduction-About YEM Technology Pty LtdYEM Technology Pty Ltd commenced operation in early 2015 and is a subsidiary of Jiangyin Yiyuan Equipment Installation Pty Ltd. YEM Technology is currently engaged by CITIC Pacific Mining to provide the Mechanical and Electrical Maintenance services to the Sino Iron Project, at Cape Preston, in Western Australia.Jiangyin Yiyuan Equipment Installation Pty Ltd, based in China, is a market leader within the professional maintenance of mechanical, electrical, instrumental and hydraulic equipment. In addition, Jiangyin Yiyuan Equipment Installation is also involved in the installation and commissioning of mechanical, electrical, instrumental and hydraulic equipment; the testing and commissioning of high voltage equipment; and integration, installation and commissioning of automated systems.With strong support from its parent company, YEM Technology Pty Ltd plans to replicate their success, by implementing a similar equipment maintenance model into the Australian resources industry, by utilising the advanced technology, experience and management systems of Jiangyin Yiyuan Equipment Installation Pty Ltd.2. Current Business Process As mentioned, YEM Perth mainly focus on providing the mechanical and electrical equipments’s installation and relevant maintenance services to the Sino Iron projects in Western Australia and relevant four core processes and following-up specifications are covered as below:Approaching ProjectsIndustry reputation (80%)Media (20%)BiddingBudget consultingSchedule estimatingPractical processes(1) Technique support(2) Equipments availability(3) Labors Training(4) Tools Preparation(5) Implementation (6) Quality Control(7) Inspection Project ClosingConclusionLessons learnedMargin analysisYEM headquarter locating in Jiangyin,China is one of the experienced tech-service supply experts in the industry. With the reputation, YEM has worked with some local governments together on some government-owned projects, which in returns gives YEM more coming orders stably.The overall business process is complete, yet as discussed with the management, the “Bidding” part is always a crucial part, especially for its branch in Perth(set up in 2015).

This proposal will concentrate on breaking down the “Bidding” into practical parts and figuring out a might-be plan B.3. Case StudyHere below comes up with a practical job YEM Perth has been worked on, coverinJob Title: Design, supply of steel works and installation for the new Fine Screen-magnetic elutriation building Option 1-Local sourcing.3.1 Scope of Work:3.1.1 High level Engineering design of building layout-for CPM approval3.1. 2 Detailed level Engineering design of steel structure and CPM approval 3.1.3 Supply of steel structure to site from local supplier3.1.4 Installation of concrete footings-including stripping and restoration of existing footings3.1.5 Engineering and survey support throughout construction3.1.6 Installation of steel structure3.1.7 Tie-in into existing structure including modes and relation of cable tray3.1.8 Installation of mechanical component fittings to structure3.1.9 Provision of all mechanical component fittings to structure3.1.10 Supply of all pipeworks, hoses,gaskets and fitting3.1.11 Installation of all pipe supports3.1.12 Installation of all pipe works3.1.13 Equipment inspection and testing, supply and install of 300mm cable ladders3.1.14 install and supply of 25 mm 4c+E cable from generator to control panel3.1.15 Connection of any trailing cables and test3.2 Exclusion:3.2.1 Commissioning is not part of this SOW3.2.2 Assembly of mechanical equipment(i.e Screen) is not part of this SOW3.3.3 Generator3.3 Client Free Issued Equipment and Materials:3.3.1 Access to overhead crane when required

Get Your Essay

Cite this page

Yem Technology Pty Ltd And Supply Of Steel Works. (June 13, 2021). Retrieved from https://www.freeessays.education/yem-technology-pty-ltd-and-supply-of-steel-works-essay/