Comparative Startegy 1970s – Building and Commissiononing a Cell Site: Procedure
Hyper activism – hip hop
Building and Commissiononing a Cell site: Procedure
Commercial inputs given to Technical listing the coordinates where a particular cell-site is needed
Design documents (DDs) floated by Technical- Cell Planning Team
Site survey by(Technical Logistics + Cell Planning +Transmission Planning+ Production)
Technical logistics to execute the contract agreement once the site location gets finalized
Energization status checked (i.) by Technical logistics
Site handed over to Production for build-out (Civil Works)
Once civil work gets completed site handed over to BSS deployment team for commissioning
Once site gets on-air the site finally handed over to OAN (Operation Access Network)
Hyper activism – hip hop
Building and Commissiononing a Cell site: Procedure
Commercial inputs given to Technical listing the coordinates where a particular cell-site is needed
Design documents (DDs) floated by Technical- Cell Planning Team
Site survey by(Technical Logistics + Cell Planning +Transmission Planning+ Production)
Technical logistics to execute the contract agreement once the site location gets finalized
Energization status checked (i.) by Technical logistics
Site handed over to Production for build-out (Civil Works)

Get Your Essay

Cite this page

Cell Site And Commercial Inputs. (July 4, 2021). Retrieved from https://www.freeessays.education/cell-site-and-commercial-inputs-essay/